Title :
Condition monitoring plans of CLP power Hong Kong and its roadmap to condition based maintenance
Author_Institution :
Power Syst. Bus. Group, CLP Power Hong Kong Ltd., Hong Kong
Abstract :
It is a common trend of power companies to progressively change its equipment maintenance strategies from relying on purely time-based preventive tasks to more condition-based predictive tasks. An important prerequisite of condition based maintenance is condition monitoring. Results of condition monitoring on power equipment form useful information in formulating asset strategies in the most cost effective manner while maximising the availability and enhancing reliability of the equipment. This paper describes the road of CLP Power Hong Kong in developing strategies and plans for condition monitoring and its roadmap to prepare for the implementation of condition based maintenance.
Keywords :
condition monitoring; maintenance engineering; power apparatus; reliability; condition based maintenance; condition monitoring plans; power equipment maintenance strategies; Asset management; Availability; Condition monitoring; Costs; Failure analysis; Partial discharges; Power system management; Power system reliability; Power transformers; Predictive maintenance; Cable Asset; Overhead Line Asset; Plant Asset; Reliability-centred Maintenance; predictive/condition-based maintenance;
Conference_Titel :
Condition Monitoring and Diagnosis, 2008. CMD 2008. International Conference on
Conference_Location :
Beijing
Print_ISBN :
978-1-4244-1621-9
Electronic_ISBN :
978-1-4244-1622-6
DOI :
10.1109/CMD.2008.4580365