DocumentCode
2319969
Title
The progress influencing factors analysis of thermal power project based on ISM method
Author
Wenjun, Chen ; Yunna, Wu
Author_Institution
Sch. of Bus. Adm., North China Electr. Power Univ., Beijing, China
Volume
3
fYear
2010
fDate
9-10 Jan. 2010
Firstpage
1613
Lastpage
1617
Abstract
The relationship among the progress influencing factors is absolutely complicated, which decreases the feasibility of progress program. The paper introduces interpretative structure modeling (ISM) method with the purpose of understanding such relationship. By selecting influencing factors, setting reachability matrix, dividing interval and differentiating grades, the interpretative structure model is established to interpret the progress influencing factors of thermal power plant. Furthermore, the corresponding countermeasures are proposed to provide experiences for the progress management in the future.
Keywords
power system management; project management; thermal power stations; interpretative structure modeling; progress influencing factors; progress management; reachability matrix; thermal power plants; Delay; Energy management; Power engineering and energy; Power generation; Power system management; Power system modeling; Systems engineering and theory; Thermal engineering; Thermal factors; Thermal management; ISM method; Reachability Matrix; thermal power plant;
fLanguage
English
Publisher
ieee
Conference_Titel
Logistics Systems and Intelligent Management, 2010 International Conference on
Conference_Location
Harbin
Print_ISBN
978-1-4244-7331-1
Type
conf
DOI
10.1109/ICLSIM.2010.5461243
Filename
5461243
Link To Document