• DocumentCode
    2320430
  • Title

    Research on the scheduling system in aluminum industry based on Multi-agent

  • Author

    Zou, Fantian ; Yin, Erwei ; Zou, Fengxing

  • Author_Institution
    Dept. of Autom. Control, Nat. Univ. of Defense Technol., Changsha, China
  • fYear
    2010
  • fDate
    16-20 Aug. 2010
  • Firstpage
    593
  • Lastpage
    596
  • Abstract
    Contra pose the character of scheduling problem in the aluminum industry, a virtual enterprise is abstracted in this paper. The VE substitute manufacturing techniques. A model of scheduling system during aluminum industry is also established based on a Multi-agent theory. As a foundation we will study the system model concerning every agent´s working mechanism and the mechanism of corresponding with each other among agents. This model totally separates the two hierarchies, virtual enterprise level and leaguer level. This hierarchy is propitious to realize a perfect collocation of resource in the whole aluminum industry; it has preferable flexibility and expansibility. To achieve the production of aluminum industry optimal scheduling, lay the foundation for achieving the objective of decreasing energy consumption and optimal scheduling in the aluminum industry.
  • Keywords
    aluminium industry; multi-agent systems; production engineering computing; scheduling; virtual enterprises; aluminum industry; energy consumption; multiagent theory; resource collocation; scheduling system; virtual enterprise; Automation; Conferences; Logistics; Aluminium Industry; Multi-Agent; Scheduling; Virtual Enterprise;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Automation and Logistics (ICAL), 2010 IEEE International Conference on
  • Conference_Location
    Hong Kong and Macau
  • Print_ISBN
    978-1-4244-8375-4
  • Electronic_ISBN
    978-1-4244-8374-7
  • Type

    conf

  • DOI
    10.1109/ICAL.2010.5585354
  • Filename
    5585354