Title :
Cost controlling for project: Drum, buffer and their quantifying
Author :
Zheng, Xiaojing ; Wang, Shihui ; Zheng, Chengyao
Author_Institution :
Economic & Manage. Sch., Wuhan Univ., Wuhan, China
Volume :
3
fYear :
2010
fDate :
9-10 Jan. 2010
Firstpage :
1779
Lastpage :
1782
Abstract :
To quantify the bottleneck and the spatial buffer and temporal buffer, a Multi-Nominal Logistic model and a power-law model are constructed respectively after identifying the bottlenecks in the project. It is conclude that the parameters ßi in the Multi-Nominal Logistic effect the investment sizes on bottlenecks and spatial buffer, the parameter m in the scale-free model decide the sizes of temporal buffer, which makes the project synchronize in world-scale.
Keywords :
costing; investment; logistics; project management; cost controlling; drum; investment; multinominal logistic model; power-law model; scale-free model; spatial buffer; temporal buffer; Business; Cost function; Energy management; Humans; Investments; Logistics; Power generation economics; Power system economics; Project management; Raw materials; Buffer; Cost Controlling; Drum;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Logistics Systems and Intelligent Management, 2010 International Conference on
Conference_Location :
Harbin
Print_ISBN :
978-1-4244-7331-1
Type :
conf
DOI :
10.1109/ICLSIM.2010.5461309
Filename :
5461309
Link To Document :
بازگشت