DocumentCode
2321343
Title
Beam commissioning and first operation of the ISAC DTL at TRIUMF
Author
Laxdal, R.E. ; Dutto, G. ; Fong, K. ; Mackenzie, G. ; Pasini, M. ; Poirier, R. ; Ruegg, R.
Author_Institution
TRIUMF, Vancouver, BC, Canada
Volume
5
fYear
2001
fDate
2001
Firstpage
3942
Abstract
The post-accelerator for the ISAC radioactive beam facility combines a 35.4 MHz RFQ and a variable energy 106 MHz DTL. The ISAC DTL is designed to accelerate ions with 3 ⩽ A/q ⩽ 6 to energies fully variable from 0.153 to 1.53 MeV/u. The unique separated function design allows efficient room-temperature acceleration and full energy variability with no degradation in beam quality. The first stable beams were accelerated in the DTL in Dec. 2000 with full commissioning in the first months of 2001. Test results with stable beams will be reported and compared with beam simulation results. In addition the initial operating experience with stable beam delivery is reported
Keywords
accelerator RF systems; accelerator magnets; beam handling equipment; electromagnets; ion accelerators; linear accelerators; particle beam bunching; particle beam dynamics; radioactive ion beams; 106 MHz; 35.4 MHz; ISAC DTL; RFQ; TRIUMF; beam commissioning; beam dynamics; beam quality degradation; beam simulation; efficient room-temperature acceleration; full energy variability; ion accelerator; post-stripper; postaccelerator; radioactive beam facility; radioactive ion beam facility; radiofrequency quadrupole; separated function design; stable beams; triple gap buncher; variable energy drift tube linear accelerator; Acceleration; Coils; Degradation; Ion beams; Life estimation; Linear particle accelerator; Particle beams; Temperature; Testing; Voltage;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001
Conference_Location
Chicago, IL
Print_ISBN
0-7803-7191-7
Type
conf
DOI
10.1109/PAC.2001.988305
Filename
988305
Link To Document