DocumentCode :
2323037
Title :
Hybrid flowshop scheduling with setup times for cold treating process in Baoshan Iron & Steel Complex
Author :
Li, Lin ; Wang, Lele ; Huo, Jiazhen
Author_Institution :
Sch. of Econ. & Manage., Tongji Univ., Shanghai, China
Volume :
1
fYear :
2010
fDate :
9-10 Jan. 2010
Firstpage :
357
Lastpage :
363
Abstract :
Seamless steel tube, including multi-variety and multi-specification products, requires variously complicated operations in the whole production process, especially in the cold treating process (CTP). This paper takes the seamless tube plant of Baoshan Iron and Steel Complex as the research background. Considering the practical production constraints, CTP scheduling problem can be viewed as a hybrid flowshop scheduling problem with sequence-dependent setup time. We formulate it as a non-linear mixed integer programming model(NMIP) with multi-objectives. Then a two-stage heuristic algorithm based on modified GA and local search method is proposed to get near-optimal solution of large-scale NMIP problem. Finally, computation experiments with real production instance are carried out to test the efficiency and performance of algorithm. The simulation results show that proposed model and algorithm can be implemented as an effective method to generate optimized scheduling scheme in the CTP scheduling system.
Keywords :
cold working; flow shop scheduling; genetic algorithms; integer programming; nonlinear programming; search problems; steel industry; Baoshan iron & steel complex; NMIP; cold treating process; heuristic algorithm; hybrid flowshop scheduling; local search method; modified GA; modified genetic algorithm; nonlinear mixed integer programming; production constraints; production process; seamless tube plant; Computational modeling; Heuristic algorithms; Iron; Large-scale systems; Linear programming; Processor scheduling; Production; Search methods; Steel; Testing; Cold treating Process; Hybrid Fowshop Scheduling; Mixed Integer Programming Model; Seamless Steel Tube Production; Sequence-dependent Setup Time; Two-stage Algorithm;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Logistics Systems and Intelligent Management, 2010 International Conference on
Conference_Location :
Harbin
Print_ISBN :
978-1-4244-7331-1
Type :
conf
DOI :
10.1109/ICLSIM.2010.5461405
Filename :
5461405
Link To Document :
بازگشت