DocumentCode
2328826
Title
Design and commissioning of the D0 vertical nondispersive overpass in the Fermilab Main Ring
Author
Trbojevic, Dejan ; Gerig, Rod
Author_Institution
Fermi Nat. Accel. Lab., Batavia, IL, USA
fYear
1989
fDate
20-23 Mar 1989
Firstpage
1831
Abstract
A vertical overpass in the Fermilab Main Ring around a future D0 proton-antiproton collision detector was designed and built to raise the initial luminosity for collider physics. The overpass provides a better dispersion match between the Main Ring and the Tevatron, and in the Main Ring substantially lowers the vertical beam size arising from momentum spread. This has also improved the overall efficiency and beam intensity of the Main Ring. Vertical dispersion was measured before and after completing the overpass. A high degree of correspondence was obtained between the predicted and measured values of vertical dispersion around the whole Main Ring. The Main Ring performance improved considerably with respect to beam intensity (which was raised from 1.2×1012 to 1.8×1012 protons per batch) as well as with respect to the Main Ring overall efficiency (which was raised from 85% up to 93%)
Keywords
beam handling equipment; beam handling techniques; particle beam diagnostics; proton accelerators; storage rings; synchrotrons; D0 vertical nondispersive overpass; Fermilab Main Ring; Tevatron; beam intensity; collider physics; dispersion match; efficiency; initial luminosity; momentum spread; vertical beam size; Accelerator magnets; Design methodology; Detectors; Dispersion; Laboratories; Particle accelerators; Particle beams; Physics; Proton accelerators; Synchrotrons;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1989. Accelerator Science and Technology., Proceedings of the 1989 IEEE
Conference_Location
Chicago, IL
Type
conf
DOI
10.1109/PAC.1989.72939
Filename
72939
Link To Document