Installation and operation of the new RF system for Lepton acceleration in the CERN SPS
Author
Faugeras, P.E. ; Kindermann, H.P. ; Linnecar, T.P.R. ; Rödel, V. ; Warman, A.
Author_Institution
CERN, Geneva, Switzerland
fYear
1989
fDate
20-23 Mar 1989
Firstpage
106
Abstract
Thirty-two accelerating modules, each made of a single-cell copper cavity, fed by its own tetrode amplifier, have been installed in the SPS (Super Proton Synchrotron) tunnel. These modules are arranged in groups of eight, each sharing the same HV power supplies and with a common RF driver chain, installed on the ground surface. Each module has its own control crate, and four independent beam control circuits have been built, one for each group of modules. Three groups have already been put into operation and have allowed acceleration of leptons in the SPS up to 18 GeV for the LEP (Large Electron-Positron collider) injection tests of July 1988, and up to the design energy of 20 GeV at a reduced intensity. First operational experience of this system in the interleaved mode of operation of the SPS is also reported
Keywords
beam handling equipment; proton accelerators; storage rings; 18 GeV; 20 GeV; RF system; SPS; Super Proton Synchrotron; accelerating modules; beam control circuits; interleaved operation mode; Acceleration; Circuit testing; Copper; Driver circuits; Life estimation; Power supplies; Protons; Radio frequency; Radiofrequency amplifiers; Synchrotrons;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1989. Accelerator Science and Technology., Proceedings of the 1989 IEEE
Conference_Location
Chicago, IL
Type
conf
DOI
10.1109/PAC.1989.72999
Filename
72999
Link To Document