    Installation and operation of the new RF system for Lepton acceleration in the CERN SPS

  • Author

    Faugeras, P.E. ; Kindermann, H.P. ; Linnecar, T.P.R. ; Rödel, V. ; Warman, A.

  • Author_Institution
    CERN, Geneva, Switzerland
  • fYear
    1989
  • fDate
    20-23 Mar 1989
  • Firstpage
    106
  • Abstract
    Thirty-two accelerating modules, each made of a single-cell copper cavity, fed by its own tetrode amplifier, have been installed in the SPS (Super Proton Synchrotron) tunnel. These modules are arranged in groups of eight, each sharing the same HV power supplies and with a common RF driver chain, installed on the ground surface. Each module has its own control crate, and four independent beam control circuits have been built, one for each group of modules. Three groups have already been put into operation and have allowed acceleration of leptons in the SPS up to 18 GeV for the LEP (Large Electron-Positron collider) injection tests of July 1988, and up to the design energy of 20 GeV at a reduced intensity. First operational experience of this system in the interleaved mode of operation of the SPS is also reported
  • Keywords
    beam handling equipment; proton accelerators; storage rings; 18 GeV; 20 GeV; RF system; SPS; Super Proton Synchrotron; accelerating modules; beam control circuits; interleaved operation mode; Acceleration; Circuit testing; Copper; Driver circuits; Life estimation; Power supplies; Protons; Radio frequency; Radiofrequency amplifiers; Synchrotrons;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1989. Accelerator Science and Technology., Proceedings of the 1989 IEEE
  • Conference_Location
    Chicago, IL
  • Type

    conf

  • DOI
    10.1109/PAC.1989.72999
  • Filename
    72999