• DocumentCode
    233822
  • Title

    Efficient Two-Phase Approaches for Branch-and-Bound Style Resource Constrained Scheduling

  • Author

    Mingsong Chen ; Fan Gu ; Lei Zhou ; Geguang Pu ; Xiao Liu

  • Author_Institution
    Shanghai Key Lab. of Trustworthy Comput., East China Normal Univ., Shanghai, China
  • fYear
    2014
  • fDate
    5-9 Jan. 2014
  • Firstpage
    162
  • Lastpage
    167
  • Abstract
    In high-level synthesis (HLS), the resource constrained scheduling (RCS) tries to explore a time-minimum schedule for low-level hardware implementations under specific resource constraints. To achieve such an optimal schedule quickly, branch-and-bound (B&B) approaches are widely investigated to prune the fruitless search space. However, due to the lack of approaches that can obtain a tight initial feasible schedule, RCS generally starts with an incompact search space, which is not time-efficient. This paper proposes an efficient two-phase approach, which can quickly shrink the search space using a smaller upper-bound for efficient B&B RCS search. The experimental results demonstrate that our approach can drastically reduce the overall RCS time.
  • Keywords
    high level synthesis; scheduling; tree searching; RCS time; branch-and-bound style resource constrained scheduling; high-evel synthesis; two-phase approaches; Benchmark testing; Dispatching; Estimation; Optimal scheduling; Processor scheduling; Schedules; Scheduling; Branch-and-Bound; High-Level Synthesis; Resource Constrained Scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    VLSI Design and 2014 13th International Conference on Embedded Systems, 2014 27th International Conference on
  • Conference_Location
    Mumbai
  • ISSN
    1063-9667
  • Type

    conf

  • DOI
    10.1109/VLSID.2014.35
  • Filename
    6733124