• DocumentCode
    2339975
  • Title

    Color-coating production scheduling in the steel industry

  • Author

    Wang, Xianpeng ; Tang, Lixin

  • Author_Institution
    Logistics Inst., Northeastern Univ., Shenyang
  • fYear
    0
  • fDate
    0-0 0
  • Abstract
    This paper proposes a new integer programming model and a tabu search heuristics for large-scale scheduling in the iron and steel industry, called color-coating production scheduling (CCPS). The results obtained from real production instances show that the model and heuristics are more effective and efficient with comparison to the manual scheduling
  • Keywords
    coatings; integer programming; production control; scheduling; search problems; steel industry; color-coating production scheduling; integer programming; large-scale scheduling; steel industry; tabu search heuristics; Coils; Continuous production; Finishing; Galvanizing; Iron; Job shop scheduling; Metals industry; Milling machines; Productivity; Steel; CCPS; Steel industry; Tabu Search;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computational Intelligence Methods and Applications, 2005 ICSC Congress on
  • Conference_Location
    Istanbul
  • Print_ISBN
    1-4244-0020-1
  • Type

    conf

  • DOI
    10.1109/CIMA.2005.1662312
  • Filename
    1662312