Title :
Railway power SCADA system commissioning "case example"
Author :
Hampton, Ian M. ; Lam, Kevin
Author_Institution :
Pacific Trinity Int. Ltd., Hong Kong, China
Abstract :
The Mass Transit Railway Corporation Ltd., installed and commissioned their first computer based Power Remote Control System in the late 1980s. The system was successfully replaced in February 2000. The paper describes the methodology adopted to prepare and facilitate the transition of the replacement computer based control system into operational service and a system review following one year of service operation
Keywords :
SCADA systems; power system control; railways; rapid transit systems; software development management; telecontrol; Mass Transit Railway Corporation; case example; computer based power remote control system; operational service; railway power SCADA system commissioning; replacement computer based control system; service operation; system review; Communication system control; Computer aided software engineering; Contracts; Control systems; Partial response channels; Power system management; Programming; Rail transportation; SCADA systems; Weight control;
Conference_Titel :
Quality Software, 2001. Proceedings.Second Asia-Pacific Conference on
Conference_Location :
Hong Kong
Print_ISBN :
0-7695-1287-9
DOI :
10.1109/APAQS.2001.990018