Scheduling of design projects with resource constraints and uncertain number of design iterations
Author :
Feng Lin ; Luh, P.B. ; Moser, B.
Author_Institution :
Dept. of Electr. & Syst. Eng., Connecticut Univ., Storrs, CT, USA
fYear :
1997
fDate :
20-20 June 1997
Firstpage :
42
Abstract :
Summary form only given. A short product design cycle is critical to the success of companies in the era of time-based competition. The underlying design activities, however, are often interlinked and quite uncertain. For example, some activities may have to be iterated several times to meet the design criteria. Furthermore, time-critical projects suffer the risk of failure if they cannot meet established target dates. Generating good and robust schedules is thus critical, especially under the concurrent engineering paradigm where the delay of a single task may have a domino effect on subsequent tasks and on other projects sharing designers and/or resources. This paper studies the scheduling of design projects with uncertain number of iterations while managing design risks. A "separable" problem formulation that balances modeling accuracy and computation complexity is created with the goal to minimize project tardiness and failure penalties. An optimization-based methodology that combines Lagrangian relaxation, stochastic dynamic programming, and "ordinal optimization" is developed. Numerical results supported by simulation demonstrate that near optimal solutions are obtained, and uncertainties are effectively managed for problems of practical sizes.
Keywords :
computational complexity; concurrent engineering; design engineering; dynamic programming; iterative methods; minimisation; project management; relaxation theory; scheduling; stochastic programming; Lagrangian relaxation; computation complexity; concurrent engineering; delay; design iterations; design project scheduling; failure penalty minimization; modeling accuracy; near-optimal solutions; optimization-based methodology; ordinal optimization; project tardiness minimization; resource constraints; short product design cycle; stochastic dynamic programming; time-based competition; uncertainties; Computational modeling; Concurrent engineering; Delay effects; Optimization methods; Processor scheduling; Product design; Project management; Risk management; Robustness; Time factors;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Advanced Intelligent Mechatronics '97. Final Program and Abstracts., IEEE/ASME International Conference on
Conference_Location :
Tokyo, Japan
Print_ISBN :
0-7803-4080-9
Type :
conf
DOI :
10.1109/AIM.1997.652900
Filename :
652900
Link To Document :
بازگشت