DocumentCode
2342874
Title
Fuzzy risk comprehensive evaluation and analysis of BOT hydropower projects in African region
Author
Meixiang, Quan ; Hongxu, Li
Author_Institution
Bus. Sch., Ho Hai Univ., Nanjing, China
Volume
2
fYear
2011
fDate
22-23 Oct. 2011
Firstpage
64
Lastpage
67
Abstract
Overseas investment in hydropower enterprises has been quickly increased with a rush, taking an important position in foreign direct investment for China. The Chinese investments in hydropower enterprises are mainly focused on Asian, African, and South American markets, especially typical of a relatively large market in Africa. The undertaking of overseas hydropower projects in the way of BOT in overseas hydropower investment have been more and more welcomed by hoar countries and particularly by developing countries. While the investment in BOT hydropower projects is generally large, certain risk exists at the same time. On this account, this article has analyzed the risk degrees for one of the African regional hydropower projects through fuzzy comprehensive analytic method. The analysis of instance shows the result concluded through this method is objective and reasonable, which can be widely applied to BOT hydropower projects in African.
Keywords
fuzzy set theory; hydroelectric power stations; investment; power generation economics; power markets; risk analysis; African region; BOT hydropower project analysis; Chinese investments; South American markets; foreign direct investment; fuzzy risk comprehensive evaluation method; hydropower enterprises; overseas hydropower investment; Bismuth; Fuzzy Mathematics; Hydropower Project; Level Analytical Method; Risk Analysis;
fLanguage
English
Publisher
ieee
Conference_Titel
System Science, Engineering Design and Manufacturing Informatization (ICSEM), 2011 International Conference on
Conference_Location
Guiyang
Print_ISBN
978-1-4577-0247-1
Type
conf
DOI
10.1109/ICSSEM.2011.6081330
Filename
6081330
Link To Document