DocumentCode :
2347078
Title :
Minimizing makespan for parallel batch processing machines with non-identical job sizes using neural nets approach
Author :
Shao, Hao ; Chen, Hua-Ping ; Huang, George Q. ; Xu, Rui ; Cheng, Ba-yi ; Wang, Shuan-shi ; Liu, Bo-wen
Author_Institution :
Dept. of Inf. Manage. & Decision Sci., Univ. of Sci. & Technol. of China, Hefei
fYear :
2008
fDate :
3-5 June 2008
Firstpage :
1921
Lastpage :
1924
Abstract :
This paper aims at minimizing the makespan for parallel batch processing machines with non-identical job sizes (NPBM) using neural nets (NN) approach. NN approach was proved effective to solve combinatorial optimization problems but no application to NPBM problems hitherto. This research provides new methods to code the NN with the introduction of Master Weight Matrix (MWM). Computational experiments show that the NN approach outperforms other algorithms in various circumstances.
Keywords :
batch processing (industrial); job shop scheduling; matrix algebra; minimisation; neural nets; NN approach; NPBM problems; combinatorial optimization problems; makespan minimization; master weight matrix; neural net approach; nonidentical job sizes; parallel batch processing machines; scheduling problems; Circuit testing; Fabrication; Job shop scheduling; Machine intelligence; Metals industry; Neural networks; Occupational stress; Optimization methods; Processor scheduling; Textile industry;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Industrial Electronics and Applications, 2008. ICIEA 2008. 3rd IEEE Conference on
Conference_Location :
Singapore
Print_ISBN :
978-1-4244-1717-9
Electronic_ISBN :
978-1-4244-1718-6
Type :
conf
DOI :
10.1109/ICIEA.2008.4582854
Filename :
4582854
Link To Document :
بازگشت