DocumentCode
2352365
Title
Operational experience of load shedding and new requirements on frequency relays
Author
Lindahl, S. ; Runvik, G. ; Stranne, G.
Author_Institution
ABB Network Partner AB, Sweden
fYear
1997
fDate
25-27 Mar 1997
Firstpage
262
Lastpage
265
Abstract
This paper summarises experience and analysis of under-frequency load shedding and power generator islanding. Most power systems can withstand the loss of a single generating unit or a single transmission line. Simultaneous loss of several power system components may cause a severe deficit in active and reactive power. The action of overexcitation limiters on the remaining generators may further aggravate the situation. Such infrequent events may cause severe drop in system frequency and voltage magnitude. Frequency relays for load shedding and power generator islanding must operate correctly even if the system frequency decays and the voltage magnitude decays rapidly at the same time
Keywords
power system control; active power; frequency decay; frequency relays; generating unit; operational experience; overexcitation limiters; power generator islanding; power systems; reactive power; transmission line; under-frequency load shedding; voltage magnitude decay;
fLanguage
English
Publisher
iet
Conference_Titel
Developments in Power System Protection, Sixth International Conference on (Conf. Publ. No. 434)
Conference_Location
Nottingham
ISSN
0537-9989
Print_ISBN
0-85296-672-5
Type
conf
DOI
10.1049/cp:19970077
Filename
608201
Link To Document