    Operational experience of load shedding and new requirements on frequency relays

  • Author

    Lindahl, S. ; Runvik, G. ; Stranne, G.

  • Author_Institution
    ABB Network Partner AB, Sweden
  • fYear
    1997
  • fDate
    25-27 Mar 1997
  • Firstpage
    262
  • Lastpage
    265
  • Abstract
    This paper summarises experience and analysis of under-frequency load shedding and power generator islanding. Most power systems can withstand the loss of a single generating unit or a single transmission line. Simultaneous loss of several power system components may cause a severe deficit in active and reactive power. The action of overexcitation limiters on the remaining generators may further aggravate the situation. Such infrequent events may cause severe drop in system frequency and voltage magnitude. Frequency relays for load shedding and power generator islanding must operate correctly even if the system frequency decays and the voltage magnitude decays rapidly at the same time
  • Keywords
    power system control; active power; frequency decay; frequency relays; generating unit; operational experience; overexcitation limiters; power generator islanding; power systems; reactive power; transmission line; under-frequency load shedding; voltage magnitude decay;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Developments in Power System Protection, Sixth International Conference on (Conf. Publ. No. 434)
  • Conference_Location
    Nottingham
  • ISSN
    0537-9989
  • Print_ISBN
    0-85296-672-5
  • Type

    conf

  • DOI
    10.1049/cp:19970077
  • Filename
    608201