DocumentCode
2357357
Title
A prognostic method for scheduling maintenance on the P2-Marx modulator
Author
Benwell, Andrew ; Burkhart, Craig ; Kemp, Mark ; Nguyen, Minh ; MacNair, Dave ; Olsen, Jeff ; Larsen, Ray
Author_Institution
Power Conversion Dept., SLAC Nat. Accel. Lab., Menlo Park, CA, USA
fYear
2010
fDate
23-27 May 2010
Firstpage
513
Lastpage
516
Abstract
The SLAC National Accelerator Laboratory is developing a second generation Marx-type modulator for the ILC, the P2-Marx. The modulator is expected to operate reliably in excess of 105 hours with minimum downtime. A prognostic system is being implemented with the development of the P2-Marx to monitor and track the health of key high voltage components. This paper discusses the way in which the prognostic system will be implemented and used to monitor the health of the P2-Marx modulator.
Keywords
high-voltage techniques; maintenance engineering; pulse generators; pulsed power supplies; scheduling; P2-Marx modulator; high voltage components; maintenance scheduling; prognostic system; second generation Marx-type modulator; Capacitance; Capacitors; Energy storage; Insulated gate bipolar transistors; Maintenance engineering; Modulation; Monitoring; high voltage; power electronics; prognostics;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Modulator and High Voltage Conference (IPMHVC), 2010 IEEE International
Conference_Location
Atlanta, GA
Print_ISBN
978-1-4244-7131-7
Type
conf
DOI
10.1109/IPMHVC.2010.5958407
Filename
5958407
Link To Document