• DocumentCode
    2357357
  • Title

    A prognostic method for scheduling maintenance on the P2-Marx modulator

  • Author

    Benwell, Andrew ; Burkhart, Craig ; Kemp, Mark ; Nguyen, Minh ; MacNair, Dave ; Olsen, Jeff ; Larsen, Ray

  • Author_Institution
    Power Conversion Dept., SLAC Nat. Accel. Lab., Menlo Park, CA, USA
  • fYear
    2010
  • fDate
    23-27 May 2010
  • Firstpage
    513
  • Lastpage
    516
  • Abstract
    The SLAC National Accelerator Laboratory is developing a second generation Marx-type modulator for the ILC, the P2-Marx. The modulator is expected to operate reliably in excess of 105 hours with minimum downtime. A prognostic system is being implemented with the development of the P2-Marx to monitor and track the health of key high voltage components. This paper discusses the way in which the prognostic system will be implemented and used to monitor the health of the P2-Marx modulator.
  • Keywords
    high-voltage techniques; maintenance engineering; pulse generators; pulsed power supplies; scheduling; P2-Marx modulator; high voltage components; maintenance scheduling; prognostic system; second generation Marx-type modulator; Capacitance; Capacitors; Energy storage; Insulated gate bipolar transistors; Maintenance engineering; Modulation; Monitoring; high voltage; power electronics; prognostics;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Modulator and High Voltage Conference (IPMHVC), 2010 IEEE International
  • Conference_Location
    Atlanta, GA
  • Print_ISBN
    978-1-4244-7131-7
  • Type

    conf

  • DOI
    10.1109/IPMHVC.2010.5958407
  • Filename
    5958407