DocumentCode :
2362718
Title :
The schedule control of engineering project based on particle swarm algorithm
Author :
Xiao Zheng ; Liu, Zhenning
Author_Institution :
Sch. of Econ. & Manage., Jiangxi Univ. of Sci. & Technol., Ganzhou, China
Volume :
1
fYear :
2010
fDate :
June 29 2010-July 1 2010
Firstpage :
184
Lastpage :
187
Abstract :
The schedule control of engineering project a unique stage of the project management, which plays an important role in the success or failure of the project. This paper analyzed the various impact factors of project progress, and developed the mathematical model of schedule control based on the quantitative description of the relationship between impact factors with the schedule control of the project. In order to improve the speed and accuracy of solving, this article uses the particle swarm algorithm to solve the above model. Finally, the empirical research showed that the method is effective in the field of project schedule control.
Keywords :
construction; particle swarm optimisation; project management; scheduling; construction project; engineering project; mathematical model; particle swarm algorithm; project management; quantitative description; schedule control; Availability; Gallium nitride; particle swarm algorithm; project; schedule control;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Communication Systems, Networks and Applications (ICCSNA), 2010 Second International Conference on
Conference_Location :
Hong Kong
Print_ISBN :
978-1-4244-7475-2
Type :
conf
DOI :
10.1109/ICCSNA.2010.5588681
Filename :
5588681
Link To Document :
بازگشت