    Generation reliability evaluation incorporating maintenance scheduling and load forecasting

  • Author

    Nayak, A.K. ; Mohanta, D.K. ; Reddy, M. Jaya Bharata

  • Author_Institution
    Dept. of EEE, Birla Inst. of Technol., Ranchi, India
  • fYear
    2012
  • fDate
    18-25 May 2012
  • Firstpage
    485
  • Lastpage
    489
  • Abstract
    Reliability evaluation at the generation level plays an important role in the electric power system. A deterministic method known as levelised reserve method has been used to evaluate the reliability. Multi class maintenance scheduling has been optimized using genetic algorithm (GA) for thermal generating units considering statutory safety norms. The case studies pertaining to power grid of Orissa State in India validate the efficacy.
  • Keywords
    genetic algorithms; load forecasting; maintenance engineering; power generation reliability; power generation scheduling; power grids; thermal power stations; India; Orissa State; deterministic method; electric power system; generation reliability evaluation; genetic algorithm; levelised reserve method; load forecasting; multiclass maintenance scheduling; power grid; statutory safety norms; thermal generating units; Genetic algorithms; Load forecasting; Maintenance engineering; Power generation; Power system reliability; Reliability; Safety; GA; Generation reliability evaluation; levelised reserve method; load forecasting; maintenance scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Environment and Electrical Engineering (EEEIC), 2012 11th International Conference on
  • Conference_Location
    Venice
  • Print_ISBN
    978-1-4577-1830-4
  • Type

    conf

  • DOI
    10.1109/EEEIC.2012.6221426
  • Filename
    6221426