DocumentCode
2366721
Title
Generation reliability evaluation incorporating maintenance scheduling and load forecasting
Author
Nayak, A.K. ; Mohanta, D.K. ; Reddy, M. Jaya Bharata
Author_Institution
Dept. of EEE, Birla Inst. of Technol., Ranchi, India
fYear
2012
fDate
18-25 May 2012
Firstpage
485
Lastpage
489
Abstract
Reliability evaluation at the generation level plays an important role in the electric power system. A deterministic method known as levelised reserve method has been used to evaluate the reliability. Multi class maintenance scheduling has been optimized using genetic algorithm (GA) for thermal generating units considering statutory safety norms. The case studies pertaining to power grid of Orissa State in India validate the efficacy.
Keywords
genetic algorithms; load forecasting; maintenance engineering; power generation reliability; power generation scheduling; power grids; thermal power stations; India; Orissa State; deterministic method; electric power system; generation reliability evaluation; genetic algorithm; levelised reserve method; load forecasting; multiclass maintenance scheduling; power grid; statutory safety norms; thermal generating units; Genetic algorithms; Load forecasting; Maintenance engineering; Power generation; Power system reliability; Reliability; Safety; GA; Generation reliability evaluation; levelised reserve method; load forecasting; maintenance scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Environment and Electrical Engineering (EEEIC), 2012 11th International Conference on
Conference_Location
Venice
Print_ISBN
978-1-4577-1830-4
Type
conf
DOI
10.1109/EEEIC.2012.6221426
Filename
6221426
Link To Document