DocumentCode
2368861
Title
Short-term hydro generation and interchange contract scheduling for Swiss Rail
Author
Christoforidis, Milton ; Awobamise, Bola ; Tong, Sai ; Frowd, R.J. ; Rahimi, Farrokh A.
Author_Institution
Swiss Rail, Zollikofen, Switzerland
fYear
1995
fDate
7-12 May 1995
Firstpage
143
Lastpage
149
Abstract
This paper describes the short-term resource scheduling (STRS) function that has been developed by Siemens-Empros as part of the new SBB/Direktion Kraftwerk (Swiss Rail) energy management system. Optimal scheduling of the single-phase hydroelectric power plants, single-phase and three-phase energy accounts, and purchase and sale of three phase energy subject to a multitude of physical and contractual constraints (including spinning and regulating reserve requirements), is the main objective of the STRS function. The operations planning horizon of STRS is one day to one week using an hourly time increment
Keywords
control system synthesis; hydroelectric power stations; load management; optimal control; power system control; power system planning; railways; scheduling; Swiss Rail; control design; energy management system; hydroelectric power plants; interchange contract scheduling; operations planning horizon; optimal generation scheduling; power systems; regulating reserve; short-term resource scheduling; single phase; spinning reserve; three phase energy purchase; Contracts; Frequency conversion; Marketing and sales; Mixed integer linear programming; Optimal scheduling; Rails; Reservoirs; Rivers; Senior members; Spinning;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Industry Computer Application Conference, 1995. Conference Proceedings., 1995 IEEE
Conference_Location
Salt Lake City, UT
Print_ISBN
0-7803-2663-6
Type
conf
DOI
10.1109/PICA.1995.515177
Filename
515177
Link To Document