    Analysis of multi-resources leveling problem with changeable resource intensity

  • Author

    Guo, Hai-Bin

  • Author_Institution
    Sch. of Manage., Qingdao Technol. Univ., Qingdao, China
  • fYear
    2010
  • fDate
    4-7 Aug. 2010
  • Firstpage
    794
  • Lastpage
    798
  • Abstract
    A new kind of multi-resources leveling model with changeable resource intensity is presented in this paper. Prolonging of activity duration is allowed in order to decrease resource intensity of activity in this model. A dimensionless variable named as duration prolonging rate is introduced to show the prolonged degree of activity duration. Time constraints among activities can be automatically satisfied with the help of this variable during the whole calculation process. Thus, infeasible solutions can be avoided. Moreover, the model can realize the same function as conventional models with unchangeable resource intensity and can fit the instance allowing unchangeable resource intensity of some special activities. Finally, the validity of the model in this paper is verified with the help of genetic algorithm.
  • Keywords
    genetic algorithms; project management; resource allocation; changeable resource intensity; genetic algorithm; multiresources leveling problem analysis; time constraints; Biological cells; Construction industry; Equations; Mathematical model; Modeling; Radio frequency; Resource management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Mechatronics and Automation (ICMA), 2010 International Conference on
  • Conference_Location
    Xi´an
  • ISSN
    2152-7431
  • Print_ISBN
    978-1-4244-5140-1
  • Electronic_ISBN
    2152-7431
  • Type

    conf

  • DOI
    10.1109/ICMA.2010.5589045
  • Filename
    5589045