Title :
Integrated risk management applied to asset reliability
Author :
Veloza, O.P. ; Tutaj, C. ; Gómez, P. ; Castro, A.F. ; Roa, L. ; Galindo, C. ; García, R.
Author_Institution :
KEMA, Bogota, Colombia
Abstract :
In 2010 CODENSA and EMGESA conducted a study with KEMA to design and develop an asset management system based on the PAS-55:2008 de facto standard for both utilities, a maintenance management analysis for selected assets at CODENSA, reliability analyses for chosen assets at CODENSA and EMGESA, and the selection and prioritization of the projects obtained as result of the developed reliability analyses. This paper presents the methodology used and the main results and conclusions of the study.
Keywords :
power system management; power system reliability; risk management; standards; CODENSA; EMGESA; PAS-55:2008 de facto standard; asset management system; asset reliability; integrated risk management; maintenance management analysis; Asset management; Companies; Maintenance engineering; Power system reliability; Reliability; Standards organizations; Asset management; Best practices; Maintenance; Power system reliability; Risk analysis;
Conference_Titel :
Innovative Smart Grid Technologies (ISGT Latin America), 2011 IEEE PES Conference on
Conference_Location :
Medellin
Print_ISBN :
978-1-4577-1802-1
DOI :
10.1109/ISGT-LA.2011.6083208