• DocumentCode
    2377066
  • Title

    Optimization of load shedding scheme in an integrated process plant

  • Author

    Grewal, Gursharan S. ; Konowalec, John W. ; Hakim, Mak

  • Author_Institution
    Syncrude Canada Ltd., Fort McMurray, Alta., Canada
  • fYear
    1997
  • fDate
    11-16 May 1997
  • Firstpage
    96
  • Lastpage
    101
  • Abstract
    An integrated process facility recently went through an update of its existing load shedding scheme due to planned process changes in the coming years. Transient simulations indicated that by changing the load shedding philosophy, the frequency profile during power shortages can be improved significantly. This paper discusses the industrial plant´s electrical/steam load balance issues, and the development of a high speed load shedding scheme
  • Keywords
    cogeneration; control system analysis computing; industrial power systems; load shedding; optimal control; power station load; power system analysis computing; power system control; steam power stations; CHP; computer simulation; control simulation; frequency profile; integrated process plant; load shedding optimisation; power shortages; transient simulation; Distributed power generation; Frequency; Performance analysis; Petroleum; Power engineering and energy; Power generation; Stability; Transient response; Turbines; Voltage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial and Commercial Power Systems Technical Conference, 1997. Conference Record, Papers Presented at the 1997 Annual Meeting., IEEE 1997
  • Conference_Location
    Philadelphia, PA
  • Print_ISBN
    0-7803-3825-1
  • Type

    conf

  • DOI
    10.1109/ICPS.1997.595999
  • Filename
    595999