DocumentCode :
2377156
Title :
Project planning and estimation with Ask Pete
Author :
Kurtz, Tim
Author_Institution :
NASA Glenn Res. Center, Sci. Applications Int. Corp., USA
fYear :
2001
fDate :
2001
Firstpage :
55
Lastpage :
61
Abstract :
Ask Pete is a software project planning tool which incorporates methodologies for cost and schedule estimation through COCOMO II; corporate risk and resource investment through the use of the Control Level methodology; and the need for external verification and validation activities through the NASA IV&V criteria. The paper examines each of these methodologies and how they interrelate in the tool to provide the characterization necessary for project planning and estimation
Keywords :
project management; project support environments; software cost estimation; software quality; Ask Pete; COCOMO II; Control Level methodology; NASA IV; NASA V; corporate risk; cost estimation; external validation; external verification; project estimation; project planning; resource investment; schedule estimation; software project planning tool; Amplitude shift keying; Application software; Costs; Databases; Documentation; Logic; NASA; Programming; Risk management; User interfaces;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Software Engineering Workshop, 2001. Proceedings. 26th Annual NASA Goddard
Conference_Location :
Greenbelt, MD
Print_ISBN :
0-7695-1456-1
Type :
conf
DOI :
10.1109/SEW.2001.992655
Filename :
992655
Link To Document :
بازگشت