• DocumentCode
    2381362
  • Title

    Implementation of a Predictive Maintenance System

  • Author

    Emoto, Clesson T. ; Tamayo, Rudy ; Hoffman, Gary R.

  • Author_Institution
    Hawaiian Electr. Co., Honolulu, HI
  • fYear
    2006
  • fDate
    21-24 May 2006
  • Firstpage
    57
  • Lastpage
    61
  • Abstract
    Electric utilities are faced with an aging power distribution systems and O & M budget constraints which from time to time threaten the operational integrity of these systems. Hawaiian Electric Company (HECO), on the island of Oahu, faces the same challenges as those found on the U.S. mainland. Through a combination of innovation and teamwork, HECO has implemented a communications and monitoring system to realize tangible savings in equipment by enabling dispatch of the correct maintenance personnel when and where needed. This paper describes HECO´s experience in implementing a real-time predictive maintenance system that has already provided significant savings not only in terms of equipment but also in the reduction of unplanned outages
  • Keywords
    computerised monitoring; maintenance engineering; power distribution; power engineering computing; Hawaiian Electric Company; monitoring system; power distribution system aging; real-time predictive maintenance system; unplanned outage reduction; Aging; Monitoring; Personnel; Power distribution; Power industry; Predictive maintenance; Real time systems; Teamwork; Technological innovation; Time factors;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Transmission and Distribution Conference and Exhibition, 2005/2006 IEEE PES
  • Conference_Location
    Dallas, TX
  • Print_ISBN
    0-7803-9194-2
  • Type

    conf

  • DOI
    10.1109/TDC.2006.1668454
  • Filename
    1668454