Title :
NERC integrating variable generation task force (IVGTF) interconnection and operating tasks
Author :
Smith, J.C. ; Piwko, Richard ; Grant, William ; Patel, Mahendra ; Beuning, Stephen ; Ahlstrom, Mark
Author_Institution :
Utility Wind Integration Group in Reston, Reston, VA, USA
Abstract :
This paper reviews six IVGTF tasks related to interconnection and operating requirements, and provides a report on their objectives, milestones and status. The three interconnection tasks are: Interconnection Requirements Enhancement (Task 1.3); Low Voltage Ride-Through (LVRT) Requirements (Task 1.7); and Balancing Authority (BA) Communications (Task 2.2). The three operating tasks are: Incorporating Forecasting in Operations (Task 2.1); Ancillary Services and Balancing Area Solutions (Task 2.3); and Operating Practices, Procedures and Tools (Task 2.4). These tasks are part of a larger series of thirteen tasks identified in Phase 1 of the IVGTF work, and further described in the companion panel session papers.
Keywords :
electric power generation; power system interconnection; NERC; ancillary services; balancing area solutions; balancing authority communications; forecasting; integrating variable generation task force; interconnection requirements enhancement; low voltage ride-through requirements; operating tasks; Balancing Area communications; Balancing Area operations; Energy Imbalance; Forecasting; Interconnection; Low voltage ride through; Wind Integration;
Conference_Titel :
Power and Energy Society General Meeting, 2010 IEEE
Conference_Location :
Minneapolis, MN
Print_ISBN :
978-1-4244-6549-1
Electronic_ISBN :
1944-9925
DOI :
10.1109/PES.2010.5589712