Title :
Implementation of a Distributed Control System for Electric Distribution Circuit Reconfiguration
Author :
Craig, Dean ; Befus, Craig
Author_Institution :
ENMAX Power Corp., Calgary, Alta.
fYear :
2006
fDate :
21-24 May 2006
Firstpage :
342
Lastpage :
347
Abstract :
ENMAX Power Corporation in Calgary, Alberta, Canada is embarking on a multi-year project to improve the reliability of their electric distribution system. To this end they are deploying a distributed control system on their least reliable electric distribution circuits to automatically isolate faults and restore power to unfaulted segments. The paper describes the distributed control system, how it was integrated into the utility´s existing SCADA system, and the reliability improvements that have been realized in the first year of operation
Keywords :
SCADA systems; distributed control; fault diagnosis; power distribution control; power distribution reliability; power system restoration; ENMAX Power Corporation; SCADA system; distributed control system; electric distribution circuit reconfiguration; electric distribution system reliability; fault isolation; power restoration; reliability improvements; Circuit faults; Distributed control; Integrated circuit reliability; Intelligent control; North America; Power system reliability; Power system restoration; SCADA systems; Substation automation; Switches;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Transmission and Distribution Conference and Exhibition, 2005/2006 IEEE PES
Conference_Location :
Dallas, TX
Print_ISBN :
0-7803-9194-2
Type :
conf
DOI :
10.1109/TDC.2006.1668515
Filename :
1668515
Link To Document :
بازگشت