Implementation of a Distributed Control System for Electric Distribution Circuit Reconfiguration
Author
Craig, Dean ; Befus, Craig
Author_Institution
ENMAX Power Corp., Calgary, Alta.
fYear
2006
fDate
21-24 May 2006
Firstpage
342
Lastpage
347
Abstract
ENMAX Power Corporation in Calgary, Alberta, Canada is embarking on a multi-year project to improve the reliability of their electric distribution system. To this end they are deploying a distributed control system on their least reliable electric distribution circuits to automatically isolate faults and restore power to unfaulted segments. The paper describes the distributed control system, how it was integrated into the utility´s existing SCADA system, and the reliability improvements that have been realized in the first year of operation
Keywords
SCADA systems; distributed control; fault diagnosis; power distribution control; power distribution reliability; power system restoration; ENMAX Power Corporation; SCADA system; distributed control system; electric distribution circuit reconfiguration; electric distribution system reliability; fault isolation; power restoration; reliability improvements; Circuit faults; Distributed control; Integrated circuit reliability; Intelligent control; North America; Power system reliability; Power system restoration; SCADA systems; Substation automation; Switches;
fLanguage
English
Publisher
ieee
Conference_Titel
Transmission and Distribution Conference and Exhibition, 2005/2006 IEEE PES
Conference_Location
Dallas, TX
Print_ISBN
0-7803-9194-2
Type
conf
DOI
10.1109/TDC.2006.1668515
Filename
1668515
Link To Document