DocumentCode :
2385473
Title :
Phasor Measurements in the Western Electric Power System
Author :
Martin, Kenneth E.
Author_Institution :
Bonneville Power Adm., Vancouver, WA
fYear :
2006
fDate :
21-24 May 2006
Firstpage :
1337
Lastpage :
1342
Abstract :
This paper presents the use of phasor measurement units (PMUs) in the Western Electric Coordinating Council (WECC) has been very successful. Phasor data recorded during the Aug. 10, 1996 blackout showed the phase difference growing as the system weakened well before system separation. It also showed clearly the dynamic system behavior before and during the blackout. WAMS measurements, particularly phasor measurements, filled the need to see system behavior that other measurements did not cover. Phasor measurements are now widely dispersed in the WECC, most of the in real-time systems. More of these are being connected in wide-area networks to support continuing efforts to improve operations
Keywords :
phase measurement; power system faults; power system measurement; BPA; Bonneville Power Administration; PMU; WAMS measurements; WECC; Western Electric Coordinating Council; Western Electric Power System; blackout; phasor measurements; system separation; Current measurement; Delay; Discrete Fourier transforms; Electric variables measurement; Particle measurements; Phase measurement; Phasor measurement units; Power measurement; Testing; Voltage;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Transmission and Distribution Conference and Exhibition, 2005/2006 IEEE PES
Conference_Location :
Dallas, TX
Print_ISBN :
0-7803-9194-2
Type :
conf
DOI :
10.1109/TDC.2006.1668706
Filename :
1668706
Link To Document :
بازگشت