DocumentCode
2386829
Title
Impact on utilization factor with increasing wind power penetration level in Jeju Island
Author
Park, J.W. ; Pyo, G.C. ; Moon, S.I.
Author_Institution
Sch. of Electr. Eng., Seoul Nat. Univ., Seoul, South Korea
fYear
2010
fDate
25-29 July 2010
Firstpage
1
Lastpage
6
Abstract
Many Korean companies are eager to construct wind farms in Jeju Island, thanks to the Government´s policy of supporting renewable energy. Total capacity of planned wind farm is 250MW and government´s target is 500MW. At the same time local government of Jeju Island has plans to build new 300MW LNG power plant or 400MW HVDC#2 with mainland. However local power demand of Jeju Island will not be increased largely in near future. Therefore the utilization factors of conventional units are to be decreased significantly. Over construction compare with scale of Jeju power system is worried in this case, it is needed to verify the feasibility of both plans. In this research, the impact on utilization factor of conventional units and HVDC transmission with increased wind power penetration level is presented. And impact of devices planned - LNG, HVDC- is also investigated. The best way for Jeju Island case to increase wind power is presented in this paper.
Keywords
HVDC power transmission; natural gas technology; wind power plants; HVDC transmission; Jeju Island; LNG power plant; power 250 MW; power 300 MW; power 400 MW; power 500 MW; renewable energy; utilization factor; wind farms; wind power penetration level; HVDC; Instantaneous wind power penetration limit; Utilization factor; Wind power; Wind power rejection;
fLanguage
English
Publisher
ieee
Conference_Titel
Power and Energy Society General Meeting, 2010 IEEE
Conference_Location
Minneapolis, MN
ISSN
1944-9925
Print_ISBN
978-1-4244-6549-1
Electronic_ISBN
1944-9925
Type
conf
DOI
10.1109/PES.2010.5590000
Filename
5590000
Link To Document