• DocumentCode
    2387445
  • Title

    Research and development of production control information system tool

  • Author

    Ishii, Yoshiriho ; Watanabe, Shizu

  • Author_Institution
    Fujitsu AMD Semicond. Ltd., Aizuwakamatsu City, Japan
  • fYear
    2000
  • fDate
    2000
  • Firstpage
    351
  • Lastpage
    354
  • Abstract
    It is necessary to obtain some types of information in real time to follow a production plan. To select necessary information, we created a production control business flow. As a result, we found out that there were two types of information that were necessary for production control. The information of first type is that of the difference between each planned stage move and actual stage move. As shown by the business flow, it is important to check the difference between the planned move and the actual move in real time and take quick action. The information of the second type is that of the causes of such difference, especially status information of the constraint equipment. We have established and operated a system that enables us to obtain such types of information and to take quick action to reduce the difference before the problem becomes serious.
  • Keywords
    electronic engineering computing; integrated circuit manufacture; production control; real-time systems; actual stage move; constraint equipment; planned stage move; production control; production control business flow; production control information system tool; real time; semiconductor production equipment; status information; Information systems; Production control; Research and development;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Semiconductor Manufacturing, 2000. Proceedings of ISSM 2000. The Ninth International Symposium on
  • ISSN
    1523-553X
  • Print_ISBN
    0-7803-7392-8
  • Type

    conf

  • DOI
    10.1109/ISSM.2000.993685
  • Filename
    993685