Title : 
Super-hot-runs management system
         
        
            Author : 
Lee, Lily ; Hsieh, Kevin ; Lin, Martin ; Luoh, Richard ; Ling, Alex ; Huang, Simon
         
        
            Author_Institution : 
F2MFG, tsmc Co., Hsin-Chu, Taiwan
         
        
        
        
        
        
            Abstract : 
Our project\´s purpose is to reduce the cycle time of "push lots". Some lots must be pushed at a faster speed than normal lots. We refer to these lots as super-hot-runs. For example: If the customer\´s special requirements includes, pilot lot or FAB potential-lot, our project\´s purpose is to reduce the cycle times of "push lots" (Super-hot-runs, pilot, hot-lots) to ensure maximum customer satisfaction. According to our historical data, the cycle times of push lots were 1.0 days/layer before we started this project. We made a project goal : by reducing the C/T from 1.0 days/layer to 0.8 days/layer. We set the goal by analyzing the percentage of run, queue, hold. Then tuned a reasonable queue time SPEC to meet C/T target. Hold time reduction is also being dealt with in this project.
         
        
            Keywords : 
integrated circuit manufacture; integrated circuit reliability; integrated circuit testing; IC manufacture; customer satisfaction; cycle time reduction; hot-lots; push lots; queue time SPEC; super-hot-runs management system; Books; Computer displays; Control systems; Customer satisfaction; Feedback; IEEE news; Manufacturing; Production control; Queueing analysis; Watches;
         
        
        
        
            Conference_Titel : 
Semiconductor Manufacturing, 2000. Proceedings of ISSM 2000. The Ninth International Symposium on
         
        
        
            Print_ISBN : 
0-7803-7392-8
         
        
        
            DOI : 
10.1109/ISSM.2000.993688