Title :
Non-traditional transmission development in the Northeast
Author :
Henderson, M. ; Chao, H. ; Buechler, J.
Abstract :
Considerable development of non-traditional transmission has been planned and implemented in the Northeast, including ties interconnecting ISO/RTOs. This paper describes how ISO New England and the New York Independent System Operator both accommodate non-traditional transmission development. The paper also describes the planning, implementation, and operating experience with nontraditional transmission facilities that have been placed into service.
Keywords :
power system interconnection; power transmission planning; ISO; RTO; independent system operator; non-traditional transmission development; power transmission planning; Elective Transmission; Financial Transmission Rights; Merchant Transmission; Open Access Transmission Tariff; Power System Operations; Power System Planning; System Impact Study; System Reliability Impact Study; Transmission Congestion Contracts;
Conference_Titel :
Power and Energy Society General Meeting, 2010 IEEE
Conference_Location :
Minneapolis, MN
Print_ISBN :
978-1-4244-6549-1
Electronic_ISBN :
1944-9925
DOI :
10.1109/PES.2010.5590177