• DocumentCode
    2391378
  • Title

    Integrated production planning and route scheduling in pulp mill industry

  • Author

    Bredström, David ; Rönnqvist, Mikael

  • Author_Institution
    Div. of Optimization, Linkoping Univ., Sweden
  • fYear
    2002
  • fDate
    7-10 Jan. 2002
  • Firstpage
    1606
  • Lastpage
    1614
  • Abstract
    In this paper, we consider the complete supply chain for a large pulp producer in Sweden. The supply chain is divided into two parts, the pulp production planning problem and the distribution-to-customers problem. We focus on the overall problem and the interaction between the partial problems, and discuss how to solve these simultaneously in a supply-chain logistic support system. We have modeled the partial problems as mixed integer optimization models and use specialized solution methods for each problem. The models become large-scaled when we consider a realistic time horizon. We therefore use flexible ways to aggregate time periods to find good solutions within reasonable time limits.
  • Keywords
    computer aided production planning; goods dispatch data processing; integer programming; logistics data processing; paper industry; problem solving; scheduling; Sweden; customer distribution; large-scale models; mixed integer optimization models; partial problem interaction; pulp mill industry; pulp production planning; route scheduling; specialized solution methods; supply-chain logistic support system; time horizon; time limits; time period aggregation; Costs; Decision making; Europe; Job shop scheduling; Meeting planning; Milling machines; Optimization methods; Production planning; Pulp and paper industry; Supply chains;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    System Sciences, 2002. HICSS. Proceedings of the 35th Annual Hawaii International Conference on
  • Print_ISBN
    0-7695-1435-9
  • Type

    conf

  • DOI
    10.1109/HICSS.2002.993986
  • Filename
    993986