DocumentCode :
2391384
Title :
An optimal ILP model for delay time to minimize peak power and area
Author :
Kim, Ki-Bog ; Lin, Chi-Ho
Author_Institution :
Dept. of Comput. Sci., Semyung Univ., Jecheon, South Korea
fYear :
2005
fDate :
20-24 July 2005
Firstpage :
358
Lastpage :
362
Abstract :
In this paper, we suggested the integer linear programming (ILP) models that went through constraint scheduling to simple cycle operation during the delay time. ILP is applicable depending on operation-delay time, operation type to be used, and datapath form to be constrained, which is required in order to practically apply the scheduling techniques by ILP to datapath. This paper described scheduling constrained to multi-cycle-operation minimizing given resources´ peak power and the number of areas under the fixed-time control constraint and ILP model of during the delay time.
Keywords :
circuit optimisation; data flow graphs; integer programming; minimisation; area minimization; delay time; fixed-time control constraint; integer linear programming; multicycle-operation minimization; optimal ILP model; peak power minimization; scheduling techniques; Circuits; Computer science; Delay effects; Equations; Hardware; Integer linear programming; Processor scheduling; Resource management; Size control; Time factors; ILP; Pipelined. B&B; area; datapath; peak-power; scheduling;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
System-on-Chip for Real-Time Applications, 2005. Proceedings. Fifth International Workshop on
Print_ISBN :
0-7695-2403-6
Type :
conf
DOI :
10.1109/IWSOC.2005.42
Filename :
1530971
Link To Document :
بازگشت