• DocumentCode
    2393627
  • Title

    A transmission owner´s perspective on the future roles and responsibilities of transmission expansion planning

  • Author

    Wiedman, Thomas E.

  • Volume
    3
  • fYear
    2002
  • fDate
    25-25 July 2002
  • Firstpage
    1054
  • Abstract
    The Eastern Interconnection is dividing into Regional Transmission Organizations. These new organizations are naming themselves Independent system operators, independent transmission companies, transmission owners, stakeholders, transmission customers and etc. They take the place of the transmission operations and planning segments of integrated electrical utilities. No longer is generation planning function and transmission planning function moving hand-in-hand within a given integrated utility. Now the process has become an open process across the interconnection under the functional control of independent system operators. This paper discusses the state of reorganization and then near and far term perceptions on how grid expansion is to be accomplished. Who will be the stakeholders, the regulators, the customers, the owners? Who will pay for the expansions? How will reliability be assured?.
  • Keywords
    electricity supply industry; power transmission planning; Eastern Interconnection; Regional Transmission Organizations; generation planning function; independent system operators; independent transmission companies; integrated utility; open process; regulators; reliability; stakeholders; transmission customers; transmission expansion planning; transmission owners; transmission planning function; Business; Continents; Control systems; Load forecasting; Meeting planning; Regulators; Security; Substations; Uncertainty; Wires;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Society Summer Meeting, 2002 IEEE
  • Conference_Location
    Chicago, IL, USA
  • Print_ISBN
    0-7803-7518-1
  • Type

    conf

  • DOI
    10.1109/PESS.2002.1043400
  • Filename
    1043400