• DocumentCode
    239460
  • Title

    Simulation for dedicated line small lot size manufacturing

  • Author

    Wen-Yu Huang ; Ke, Leo ; Shen, Tina

  • Author_Institution
    Manuf. Technol. Center, Taiwan Semicond. Manuf. Co., Hsinchu, Taiwan
  • fYear
    2014
  • fDate
    7-10 Dec. 2014
  • Firstpage
    2640
  • Lastpage
    2648
  • Abstract
    With the speedup of product innovation, product life cycles are becoming shorter and shorter. To fully support customers, a foundry fab has to speed up its wafer-output schedule to shorten the time to market in the growth stage. High priority setting and small lot strategy are common techniques for accelerating manufacturing cycle time. However, small lot strategy would accompany 1.2% of extra equipment investment. The improvement should be sufficient so that the extra investment is worthy. Therefore, the novel strategy, dedicated line for small lot size manufacturing, is proposed in this paper, which allocates exclusive resources for expediting lots to greatly improve the manufacturing cycle time. By distinguishing dedicated lines from regular lines, the proposed strategy improves 21.7% of cycle time for expediting lots. Plenty of simulation results can evidence that the proposed strategy significantly outperforms mixed run mode.
  • Keywords
    foundries; lot sizing; semiconductor device manufacture; semiconductor technology; dedicated line small lot size manufacturing; foundry fab; manufacturing cycle time; product innovation; product life cycles; regular lines; time-to-market; wafer-output schedule; Acceleration; Foundries; Load modeling; Manufacturing; Mathematical model; Productivity; Semiconductor device modeling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Simulation Conference (WSC), 2014 Winter
  • Conference_Location
    Savanah, GA
  • Print_ISBN
    978-1-4799-7484-9
  • Type

    conf

  • DOI
    10.1109/WSC.2014.7020108
  • Filename
    7020108