DocumentCode
239460
Title
Simulation for dedicated line small lot size manufacturing
Author
Wen-Yu Huang ; Ke, Leo ; Shen, Tina
Author_Institution
Manuf. Technol. Center, Taiwan Semicond. Manuf. Co., Hsinchu, Taiwan
fYear
2014
fDate
7-10 Dec. 2014
Firstpage
2640
Lastpage
2648
Abstract
With the speedup of product innovation, product life cycles are becoming shorter and shorter. To fully support customers, a foundry fab has to speed up its wafer-output schedule to shorten the time to market in the growth stage. High priority setting and small lot strategy are common techniques for accelerating manufacturing cycle time. However, small lot strategy would accompany 1.2% of extra equipment investment. The improvement should be sufficient so that the extra investment is worthy. Therefore, the novel strategy, dedicated line for small lot size manufacturing, is proposed in this paper, which allocates exclusive resources for expediting lots to greatly improve the manufacturing cycle time. By distinguishing dedicated lines from regular lines, the proposed strategy improves 21.7% of cycle time for expediting lots. Plenty of simulation results can evidence that the proposed strategy significantly outperforms mixed run mode.
Keywords
foundries; lot sizing; semiconductor device manufacture; semiconductor technology; dedicated line small lot size manufacturing; foundry fab; manufacturing cycle time; product innovation; product life cycles; regular lines; time-to-market; wafer-output schedule; Acceleration; Foundries; Load modeling; Manufacturing; Mathematical model; Productivity; Semiconductor device modeling;
fLanguage
English
Publisher
ieee
Conference_Titel
Simulation Conference (WSC), 2014 Winter
Conference_Location
Savanah, GA
Print_ISBN
978-1-4799-7484-9
Type
conf
DOI
10.1109/WSC.2014.7020108
Filename
7020108
Link To Document