Title :
Research on Improved PERT Model in Analysis of Schedule Risk of Project
Author :
Zhang Yunning ; Sun Xixi
Author_Institution :
Bus. Sch., Hohai Univ., Nanjing, China
Abstract :
PERT (program evaluation and review technique) is one of the most popular means in Project Time Management, however, it exists some shortcomings. Based on the assumptions of PERT, this paper illustrates the disadvantages of the normal three times estimation method and gives countermeasures to solve these problems. Firstly, it adopts the Monroe method to improve the normal ß distribution. Secondly, it improves the accuracy of the normal method of three times estimation by adopting the restrictive probability to estimate the three times and the minimal deviation model. Thirdly, it considers the effects of the secondarily crucial line. Consequently, the paper applies a new model to analyze schedule risk of project and divides it into five different grades.
Keywords :
PERT; risk management; scheduling; time management; Monroe method; improved PERT model; minimal deviation model; normal ß distribution; program evaluation and review technique; project schedule risk; project time management; secondarily crucial line; three times estimation method; Accuracy; Analytical models; Data models; Estimation; Gaussian distribution; Schedules; Monroe method; PERT; scedule risk; the restrictive probability of three times estimation;
Conference_Titel :
E-Business and E-Government (ICEE), 2010 International Conference on
Conference_Location :
Guangzhou
Print_ISBN :
978-0-7695-3997-3
DOI :
10.1109/ICEE.2010.699