DocumentCode :
239987
Title :
Prioritization of underground transmission cable renewal projects in power electric utility companies
Author :
Wong, Kai-Kit
Author_Institution :
Transm. Eng. Hydro One Networks Inc., Toronto, ON, Canada
fYear :
2014
fDate :
4-7 May 2014
Firstpage :
1
Lastpage :
5
Abstract :
This paper reviews the current asset management methodologies in power electric utility companies and identifies the present challenges and problems encountered by utility companies with the current methodologies in managing and prioritizing underground transmission cable asset renewal projects. This paper proposes as an addition to the current methodologies, a more systematic framework for evaluating and ranking underground transmission cable asset renewal investment projects based on the modelling of uncertainties and on determining the relative importance of a particular transmission line circuit in the power system as it affects the bulk power system reliability.
Keywords :
electricity supply industry; underground cables; underground transmission systems; bulk power system reliability; current asset management methodologies; power electric utility companies; transmission line circuit; underground transmission cable asset renewal investment projects; underground transmission cable renewal projects; Companies; Power cables; Power system reliability; Reliability; Uncertainty; Asset Management; Best Practices; Power System Reliability; Uncertainty Modeling; Underground Transmission Cables;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electrical and Computer Engineering (CCECE), 2014 IEEE 27th Canadian Conference on
Conference_Location :
Toronto, ON
ISSN :
0840-7789
Print_ISBN :
978-1-4799-3099-9
Type :
conf
DOI :
10.1109/CCECE.2014.6900973
Filename :
6900973
Link To Document :
بازگشت