40% cycle time improvement as a result of continuous improvement activities
Author :
Janke, Bernd ; Kuschereitz, Uwe
Author_Institution :
Qimonda Dresden GmbH & Co. oHG, Dresden, Germany
fYear :
2009
fDate :
10-12 May 2009
Firstpage :
91
Lastpage :
93
Abstract :
This paper describes an ongoing lean transformation in a Qimonda 300 mm Frontend Wafer-FAB, resulting in a 40% cycle time reduction so far. Chip delivery at higher reliability, decreased costs by waste reduction, shorter time to market and faster yield learning by shorter learning cycles are the major outcomes of the project. Key to success was the coordinated, orchestrated effort, involving all contributing functional areas at the site. Strong performance measures were introduced, which are followed up in the continuous improvement process.
Keywords :
product development; semiconductor device manufacture; semiconductor device reliability; Qimonda Frontend Wafer-FAB; chip delivery; continuous improvement activities; product development; semiconductor frontend manufacturing; waste reduction; Constraint optimization; Continuous improvement; Costs; Lean production; Manufacturing industries; Product development; Semiconductor device manufacture; Semiconductor device measurement; Time to market; Waste reduction;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Advanced Semiconductor Manufacturing Conference, 2009. ASMC '09. IEEE/SEMI
Conference_Location :
Berlin
ISSN :
1078-8743
Print_ISBN :
978-1-4244-3614-9
Electronic_ISBN :
1078-8743
Type :
conf
DOI :
10.1109/ASMC.2009.5155960
Filename :
5155960
Link To Document :
بازگشت