DocumentCode
2401329
Title
Reducing set-up times for improved flexibility in high-mix low-volume electric drives production
Author
Fritsche, Ronny
Author_Institution
Manuf. & Remanufacturing Technol., Univ. of Bayreuth, Bayreuth, Germany
fYear
2011
fDate
28-29 Sept. 2011
Firstpage
74
Lastpage
77
Abstract
Today´s business environment increasingly requires the capability of producing electric drives in smaller lot sizes in order to be able to respond quickly to changing customer demands without suffering from large stocks, excess capacities or challenging the company´s ability to deliver. This flexibility is a crucial element of success for both, an increased customer service as well as a lean and competitive production system. A key enabler for achieving flexibility and implementing lean production is the reduction of set-up times.
Keywords
customer services; electric drives; lean production; competitive production system; customer demands; customer service; high-mix low-volume electric drives production; lean production; set-up times; Companies; Context; Manufacturing; Optimization; Production; Systematics; Windings; Electric drives production; SMED; set-up time reduction; winding;
fLanguage
English
Publisher
ieee
Conference_Titel
Electric Drives Production Conference (EDPC), 2011 1st International
Conference_Location
Nuremberg
Print_ISBN
978-1-4577-1371-2
Type
conf
DOI
10.1109/EDPC.2011.6085553
Filename
6085553
Link To Document