DocumentCode :
240173
Title :
A scheduling approach for ship design project with fields constraint in tasks and human resources
Author :
Shiyun Li ; Jiansha Lu ; Weiguang Jiang ; Hao Yu
Author_Institution :
Coll. of Mech. Eng., Zhejiang Univ. of Technol., Hangzhou, China
fYear :
2014
fDate :
5-7 Nov. 2014
Firstpage :
37
Lastpage :
41
Abstract :
The subject of this paper is a complex ship design project scheduling where resources are labor forces and tasks are limited to deadlines. Furthermore, every labor force has skill in one field and tasks should be performed with labor force in same field. The design project has to be scheduled before it starts and tasks are assigned to designers with restrictions that each designer can execute one task at same time only and a task can be performed by one designer during its period, so that we respect most of the constraints and minimize the project finish date. We give a linear programming formulation of this problem. Then a practical approach is then developed. Finally, a hypothetical example is presented in order to demonstrate how it works in practice.
Keywords :
design engineering; human resource management; labour resources; linear programming; project management; scheduling; ships; fields constraint; human resources; labor force; linear programming formulation; project finish date minimization; project managment; ship design project scheduling approach; Algorithm design and analysis; Educational institutions; Heuristic algorithms; Linear programming; Marine vehicles; Operations research; Schedules; project managment; project scheduling; ship design project; task assign;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Cognitive Infocommunications (CogInfoCom), 2014 5th IEEE Conference on
Conference_Location :
Vietri sul Mare
Type :
conf
DOI :
10.1109/CogInfoCom.2014.7020485
Filename :
7020485
Link To Document :
بازگشت