Title :
A 5 GeV injector for PEP
Author :
Nuhn, H.-D. ; Boyce, R. ; Gould, R. ; Winick, H. ; Youngman, B. ; Yotam, R.
Author_Institution :
Stanford Synchrotron Radiat. Lab., CA, USA
Abstract :
The authors describe a project for providing the SSRL (Stanford Synchrotron Radiation Laboratory) with a dedicated injector for both PEP (Positron-Electron Project) and SPEAR by upgrading the SPEAR 3-GeV injector synchrotron, a 10-Hz cycling synchrotron served by a 150-MeV linac capable of accelerating 1010 or more electrons per cycle now under construction, to function at 6 GeV and by transporting the electron beam through a 240-m-long tunnel to PEP. After injection at 5 GeV, the energy of PEP will be ramped to 6-10 GeV for most anticipated dedicated operation for synchrotron radiation research. As an interim dedicated injector, it will facilitate the utilization and development of PEP as a synchrotron radiation source until a full-energy, dedicated injector is warranted
Keywords :
electron accelerators; storage rings; synchrotron radiation; synchrotrons; 10 Hz; 5 GeV; PEP; Positron-Electron Project; SPEAR; Stanford Synchrotron Radiation Laboratory; cycling synchrotron; electron beam; injector synchrotron; linac; synchrotron radiation source; Costs; Laboratories; Linear particle accelerator; Petroleum; Proposals; Radio frequency; Synchrotron radiation;
Conference_Titel :
Particle Accelerator Conference, 1989. Accelerator Science and Technology., Proceedings of the 1989 IEEE
Conference_Location :
Chicago, IL
DOI :
10.1109/PAC.1989.73400