Improvement of Time Parameter Calculation Models for the Multi-Dependency Network
Author :
Hongxiang Ouyang ; Yinghui Jian
Author_Institution :
Bus. Sch., Hohai Univ., Nanjing, China
fYear :
2010
fDate :
7-9 May 2010
Firstpage :
4121
Lastpage :
4123
Abstract :
The complexity of the existing time parameter calculation methods limits its wide-spread use for the multi-dependency network. Aimed at the above shortcoming, this paper develops a new conception which is overlap time difference on the basis of the study on the relationship between two activities, and then the multi-dependency network is transformed into activity-on-network in broad sense. Forwardly, the paper also presents corresponding time parameter calculation steps and formulas which reduce calculation works greatly. Finally, the effectiveness of the new methods is tested and verified by an example.
Keywords :
architecture; construction; activity-on-network; multi-dependency network; time parameter calculation models; Complexity theory; Construction industry; Educational institutions; Presses; Project management;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
E-Business and E-Government (ICEE), 2010 International Conference on
Conference_Location :
Guangzhou
Print_ISBN :
978-0-7695-3997-3
Type :
conf
DOI :
10.1109/ICEE.2010.1035
Filename :
5591332
Link To Document :
بازگشت