DocumentCode :
2410481
Title :
Public institution fast tracking solar panel array implementation
Author :
Orndoff, C. ; Shepard, J.
Author_Institution :
Florida Gulf Coast Univ., Fort Myers, FL, USA
fYear :
2009
fDate :
18-20 May 2009
Firstpage :
1
Lastpage :
4
Abstract :
This paper is a case study of the implementation of one of the nation´s largest solar array panel arrays, within a year´s time frame at a public university. The state funding received for solar energy will create 2 megawatts per day for a savings of 22 million dollars over 30 years.
Keywords :
solar cell arrays; solar power stations; fast tracking solar panel array; public institution solar panel array implementation; solar array; solar energy; Costs; Educational institutions; Global warming; Licenses; Power engineering and energy; Proposals; Solar energy; Sun; Weapons; Wildlife; Engineering Communication; Engineering Management & Leadership; Public Institution Solar Panel Implementation; Sustainability;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Sustainable Systems and Technology, 2009. ISSST '09. IEEE International Symposium on
Conference_Location :
Phoenix, AZ
Print_ISBN :
978-1-4244-4324-6
Type :
conf
DOI :
10.1109/ISSST.2009.5156694
Filename :
5156694
Link To Document :
بازگشت