• DocumentCode
    2412403
  • Title

    The Application of the Fuzzy Evaluation Method in the Determination of Optimal Rush Repair Scheme for Oil Pipeline Accident

  • Author

    Peng, Shanbi ; Liu, Enbin

  • fYear
    2011
  • fDate
    21-23 Oct. 2011
  • Firstpage
    663
  • Lastpage
    666
  • Abstract
    Because of all kinds of influencing factors, oil pipeline accident occurs frequently. It is important to find the best rush repair scheme, which is influenced by many qualitative and quantitative factors. Using the fuzzy evaluation method one can transform the qualitative evaluation into quantitative evaluation, so the analysis can be more comprehensive and accurate. The factor aggregate includes reliability, reaction time, accident loss, cost and social influence, of which each consists of a few factors. This paper gave an application example of the fuzzy evaluation for leakage accident with oil pipeline. According to experts´ discussion, three feasible rush repair scheme were determined firstly, then the optimal rush repair scheme was determined, which according with on-the-spot reality.
  • Keywords
    Accidents; Educational institutions; Maintenance engineering; Materials reliability; Pipelines; Reliability engineering; Accident; Fuzzy Evaluation Method; Oil Pipeline; Optimal Rush Repair Scheme;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computational and Information Sciences (ICCIS), 2011 International Conference on
  • Conference_Location
    Chengdu, China
  • Print_ISBN
    978-1-4577-1540-2
  • Type

    conf

  • DOI
    10.1109/ICCIS.2011.276
  • Filename
    6086285