DocumentCode
2412403
Title
The Application of the Fuzzy Evaluation Method in the Determination of Optimal Rush Repair Scheme for Oil Pipeline Accident
Author
Peng, Shanbi ; Liu, Enbin
fYear
2011
fDate
21-23 Oct. 2011
Firstpage
663
Lastpage
666
Abstract
Because of all kinds of influencing factors, oil pipeline accident occurs frequently. It is important to find the best rush repair scheme, which is influenced by many qualitative and quantitative factors. Using the fuzzy evaluation method one can transform the qualitative evaluation into quantitative evaluation, so the analysis can be more comprehensive and accurate. The factor aggregate includes reliability, reaction time, accident loss, cost and social influence, of which each consists of a few factors. This paper gave an application example of the fuzzy evaluation for leakage accident with oil pipeline. According to experts´ discussion, three feasible rush repair scheme were determined firstly, then the optimal rush repair scheme was determined, which according with on-the-spot reality.
Keywords
Accidents; Educational institutions; Maintenance engineering; Materials reliability; Pipelines; Reliability engineering; Accident; Fuzzy Evaluation Method; Oil Pipeline; Optimal Rush Repair Scheme;
fLanguage
English
Publisher
ieee
Conference_Titel
Computational and Information Sciences (ICCIS), 2011 International Conference on
Conference_Location
Chengdu, China
Print_ISBN
978-1-4577-1540-2
Type
conf
DOI
10.1109/ICCIS.2011.276
Filename
6086285
Link To Document