DocumentCode
2412893
Title
Task rescheduling using a coordinator in a structural decentralised control of discrete-event systems
Author
Sang-Heon Lee ; Ill-Soo Kim ; Wong, K.C.
Author_Institution
Centre for Adv. Manuf. Res., Univ. of South Australia, Mawson Lakes, SA, USA
fYear
2002
fDate
11-13 Feb. 2002
Firstpage
223
Lastpage
228
Abstract
A problem of task rescheduling using a coordinator in a structural decentralised control of discrete-event systems is formulated. After the local supervisors have been designed for a given task, a coordinator can be used to solve some rescheduling problems among local plants. The coordination system models the interactions of local plants, and is consisting of only the shared events, so simpler to synthesise. Under the conditions developed in this paper, the combined concurrent actions of the coordinator with the existing local supervisors can achieve the rescheduling requirements. An example is provided for illustration.
Keywords
controllability; decentralised control; discrete event systems; process control; scheduling; chemical batch reactor; controllability; coordination system; discrete-event systems; rescheduling; structural control; structural decentralised control; supervisory control; task rescheduling; Australia; Control systems; Discrete event systems; Distributed control; Supervisory control;
fLanguage
English
Publisher
ieee
Conference_Titel
Information, Decision and Control, 2002. Final Program and Abstracts
Conference_Location
Adelaide, SA, Australia
Print_ISBN
0-7803-7270-0
Type
conf
DOI
10.1109/IDC.2002.995401
Filename
995401
Link To Document