• DocumentCode
    2419140
  • Title

    Intermediate performance measures in engineering projects

  • Author

    Thompson, C.W.

  • Author_Institution
    Dept. of Ind. Eng. & Manage. Sci., Northwestern Univ., Evanston, IL
  • fYear
    1997
  • fDate
    27-31 Jul 1997
  • Firstpage
    392
  • Abstract
    Summary form only given. Conventional methods for measuring progress during an engineering project include the use of supervisors and milestones, and a variety of scheduling and cost procedures. This exploratory survey draws upon the literature and inputs from engineering managers to identify other measures employed to provide a comparison of planned with actual progress
  • Keywords
    project management; scheduling; cost procedures; engineering project management; intermediate performance measures; milestones; scheduling procedures; supervisors; Calendars; Costs; Ear; Electric breakdown; Engineering management; Industrial engineering; Job shop scheduling; Project management; Testing; Time measurement;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Innovation in Technology Management - The Key to Global Leadership. PICMET '97: Portland International Conference on Management and Technology
  • Conference_Location
    Portland, OR
  • Print_ISBN
    0-7803-3574-0
  • Type

    conf

  • DOI
    10.1109/PICMET.1997.653425
  • Filename
    653425