DocumentCode
2420844
Title
A mathematical model on an economic lot scheduling problem with shifting process and joint material replenishment
Author
Dah-Chuan Gong ; Jhin-Yong Lin ; Lin, Gary C. ; Wen-Na Ma
Author_Institution
Dept. of Ind. & Syst. Eng., Chung Yuan Christian Univ., Chungli, Taiwan
fYear
2013
fDate
10-13 Dec. 2013
Firstpage
1219
Lastpage
1222
Abstract
This paper focuses on developing a mathematical model for solving the Economic Lot Scheduling Problem (ELSP) under an imperfect (shifting) process that includes joint material replenishment, in-production screening process, imperfect rework process, scraps and shortage. The Common Cycle (CC) approach is applied for the problem formulation. Although this paper only demonstrates the first step, further research works will be on conducting effective problem solving procedures.
Keywords
industrial economics; lot sizing; scheduling; CC approach; ELSP; common cycle approach; economic lot scheduling problem; imperfect rework process; in-production screening process; joint material replenishment; mathematical model; scraps; shifting process; shortage; Economics; Job shop scheduling; Joints; Mathematical model; Raw materials; Economic lot scheduling problem; raw material replenishment; shifting process;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IEEM), 2013 IEEE International Conference on
Conference_Location
Bangkok
Type
conf
DOI
10.1109/IEEM.2013.6962605
Filename
6962605
Link To Document