DocumentCode
2421303
Title
The Application of Design Structure Matrix in Project Schedule Management
Author
Zhang, Yuchao ; Bai, Sijun ; Guo, Yuntao
Author_Institution
Sch. of Manage., Northwestern Polytech. Univ., Xi´´an, China
fYear
2010
fDate
7-9 May 2010
Firstpage
2813
Lastpage
2816
Abstract
This paper analyzes the limitation of traditional method of Project Schedule Management, and put forward a method of using DSM to cluster the work, when there is a coupling of the information flow of the work. It can reduce the number of coupling, shorten the communication time, shorten the project cycle, and also provide a new way of thinking for project schedule management.
Keywords
matrix algebra; pattern clustering; project management; scheduling; design structure matrix; information flow coupling; project cycle; project schedule management; work clustering; Computational modeling; Couplings; Educational institutions; Parallel processing; Product development; Project management; Schedules; DSM; clustering; coupling; project management;
fLanguage
English
Publisher
ieee
Conference_Titel
E-Business and E-Government (ICEE), 2010 International Conference on
Conference_Location
Guangzhou
Print_ISBN
978-0-7695-3997-3
Type
conf
DOI
10.1109/ICEE.2010.710
Filename
5591912
Link To Document