• DocumentCode
    2421303
  • Title

    The Application of Design Structure Matrix in Project Schedule Management

  • Author

    Zhang, Yuchao ; Bai, Sijun ; Guo, Yuntao

  • Author_Institution
    Sch. of Manage., Northwestern Polytech. Univ., Xi´´an, China
  • fYear
    2010
  • fDate
    7-9 May 2010
  • Firstpage
    2813
  • Lastpage
    2816
  • Abstract
    This paper analyzes the limitation of traditional method of Project Schedule Management, and put forward a method of using DSM to cluster the work, when there is a coupling of the information flow of the work. It can reduce the number of coupling, shorten the communication time, shorten the project cycle, and also provide a new way of thinking for project schedule management.
  • Keywords
    matrix algebra; pattern clustering; project management; scheduling; design structure matrix; information flow coupling; project cycle; project schedule management; work clustering; Computational modeling; Couplings; Educational institutions; Parallel processing; Product development; Project management; Schedules; DSM; clustering; coupling; project management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    E-Business and E-Government (ICEE), 2010 International Conference on
  • Conference_Location
    Guangzhou
  • Print_ISBN
    978-0-7695-3997-3
  • Type

    conf

  • DOI
    10.1109/ICEE.2010.710
  • Filename
    5591912