DocumentCode
2421522
Title
Organizational tailoring of the CMM questionnaire for internal process improvement [software development management]
Author
Pryor, Alan N. ; Mcguire, Eugene G.
Author_Institution
Syst. Group Inf. Technol., Texas Instrum. Inc., Plano, TX, USA
fYear
1997
fDate
27-31 Jul 1997
Firstpage
621
Lastpage
624
Abstract
Some organizations are attempting to reduce the time and cost required by formal process improvement models by tailoring those models to specific needs. This paper describes a tailored version of the Software Engineering Institute´s (SEI) capability maturity model (CMM) questionnaire which was developed by a large US-based Fortune 500 company for low-cost internal process improvement purposes
Keywords
software development management; software houses; software quality; Fortune 500 company; Software Engineering Institute; USA; capability maturity model questionnaire; formal process improvement models; internal process improvement; software development management; software houses; Capability maturity model; Coordinate measuring machines; Costs; Information management; Project management; Quality management; Software engineering; Software quality; Subcontracting; Technology management;
fLanguage
English
Publisher
ieee
Conference_Titel
Innovation in Technology Management - The Key to Global Leadership. PICMET '97: Portland International Conference on Management and Technology
Conference_Location
Portland, OR
Print_ISBN
0-7803-3574-0
Type
conf
DOI
10.1109/PICMET.1997.653536
Filename
653536
Link To Document