Title :
Endurance test of the pantographs for main line vehicles
Author :
Skala, Bohumil ; Fort, Jiri
Author_Institution :
Dept. of Electromech. & Power Electron., Univ. of West Bohemia in Pilsen, Pilsen, Czech Republic
Abstract :
The pantographs producer needs to perform the lifetime test of the pantographs. This test usually takes 2 months when the test is running continuously 24 hours per day. We must design and build mechanical frame and control unit as well. It was our first experience with the lifetime test of this type. In addition, all preparation must be done during 2 weeks. The fast starting of the endurance test - it was our benefit before the rival company.
Keywords :
pantographs; main line vehicles; mechanical frame; pantograph endurance test; Frequency conversion; Optical switches; Pulleys; Relays; Testing; Vehicles; Main line vehicle; current collector systems; endurance test; height at “low operating position”; height at “upper operating position”; pantographs; railway applications;
Conference_Titel :
ELEKTRO, 2012
Conference_Location :
Rajeck Teplice
Print_ISBN :
978-1-4673-1180-9
DOI :
10.1109/ELEKTRO.2012.6225647